Subcontractor CMMC Tracker
Findings · finding 4 of 12

Subcontractor POA&M open past 180 days: what 32 CFR 170.21 says

A conditional status needs a score of at least 0.8 of 110, which is 88 (32 CFR 170.21(a)(2)(i)); the POA&M closes out within 180 days of the Conditional CMMC Status Date or the conditional status expires (170.21(b)); a POA&M is not permitted at Level 1 (170.21(a)(1)).

What the register reads

a date to chase

Ask whether the POA&M closeout assessment has been done and posted, and on what date.

The rule sentences behind it

4 cited
32 CFR 170.21(a)(2)(i)codified text, eCFR current to 24 Sep 2026

The assessment score divided by the total number of CMMC Level 2 security requirements is greater than or equal to 0.8;

Threshold read: conditional status only with a score of at least 0.8 of 110, which is 88. Source
32 CFR 170.21(b)codified text, eCFR current to 24 Sep 2026

The closing of a POA&M must be confirmed by a POA&M closeout assessment within 180-days of the Conditional CMMC Status Date. If the POA&M is not successfully closed out within the 180-day timeframe, the Conditional CMMC Status for the information system will expire.

Threshold read: POA&M closeout within 180 days of the Conditional CMMC Status Date. Source
DFARS 252.204-7021, "current" (1)(i)codified text, eCFR current to 24 Sep 2026; the same text is carried in Class Deviation 2026-O0025, effective 1 Feb 2026

Not older than 180 days for Conditional Level 2 (Self) assessments and Conditional Level 2 (certified third-party assessment organization (C3PAO)) assessments

Threshold read: Conditional Level 2: not older than 180 days. Source
32 CFR 170.21(a)(1)codified text, eCFR current to 24 Sep 2026

A POA&M is not permitted at any time for Level 1 self-assessments.

Threshold read: no POA&M at Level 1. Source

The clauses behind it

CMMC L2 CA.L2-3.12.2Plan of Action 3 points in the score

Develop and carry out plans of action that correct identified deficiencies and reduce or eliminate vulnerabilities.

What an assessor asks to see: Plan of action and milestones with owners and target dates; Evidence of progress and closure for completed items; Linkage from assessment findings to plan entries
Where subcontractors usually fall short: Plan maintained as a static list with no progress; Findings closed without evidence of correction; Deficiencies identified but never entered into the plan
Source: CMMC 2.0 Level 2 (NIST SP 800-171 Rev 2)

A line that raises it

invented

Pinecrest Fasteners | 7PF31 | 95 | 2026-02-10 | Level 2 (Self), conditional | 2026-02-10 | yes | no | yes | | 3 | 2026-10-30

See it in the specimen